Babylon Studio - Team 24
Block-based 3D educational platform for Babylon.js


Abstract
Babylon Studio is a lightweight, web-based platform designed to simplify advanced 3D development concepts for learners. Our project addresses the challenges faced by students, especially beginners, as traditional game engines and 3D tools overwhelm them with technical jargon and complex interfaces.
Leveraging Babylon.js, Babylon Studio provides an intuitive, block-based control system that enables users to import and manipulate objects with ease. Through interactive blocks, users can adjust material parameters, modify scene conditions, and experiment with animation effects in real time.
An integrated AI assistant guides users in applying these effects, bridging the gap between theoretical learning and practical application. By simplifying the exploration modern rendering techniques, Babylon Studio aims to enhance understanding and spark innovation in 3D modeling and game development education.
Introduction and Project Demo
Gantt Chart

Team Members
Aditya Mukhija
Programmer, Designer
Adwit Hans
Programmer, Researcher
Shaye Garg
Team Leader, Programmer
Sara Craciun
Report Writer, Programmer