Team Roles

Project Background

Ed:
 Shaper:
  1. Assigns work load to the team members and provides encouragement.
  2. Identifies areas of improvement.
  3. Puts the project together and constructs a strong architecture for the project.
 Coordinator:
  1. Works as the team leader/ chairperson and guides the team.
  2. Coordinate and interact with the mentors and team members and gathers the ideas and information.
  3. Maintains correspondence with the team and mentors.
 Monitor-Evaluator:
  1. Monitors the team progress and documents the achievements of the team.
  2. Evaluates the efficiency of the products and identifies areas of significant improvement.
  3. Works on areas to improve the system and make it more efficient.
 Major contributions: Overall team and project development, Integration of the tool segmentation based on color and augmentation using depth and Documentation and Research.

Tom:
 Implementer:
  1. Ideas and approaches are implemented swiftly.
  2. The ideas are implemented in iterations. Iterations are performed regularly.
 Resource Investigator:
  1. Researches about different approaches to tackle a problem and provides different solutions to the problem at hand.
  2. Aims to research about approaches to make the system more efficient than the previous iteration.
 Plant:
  1. Generates ideas and prototypes that are required to solve issues.
  2. Innovative ideas are produced.
  3. The ideas produced help in the progression development of the system.
 Major contributions: Towards developing the tool proximity, main prototype for the project, Documentation and Research.

Kirthi:
 Implementer:
  1. Ideas and approaches are implemented swiftly.
  2. The ideas are implemented in iterations. Iterations are performed regularly.
 Plant:
  1. Generates ideas and prototypes that are required to solve issues.
  2. Innovative ideas are produced.
  3. The ideas produced help in the progression development of the system.
 Specialist:
  1. Skills in a particular field that helped the team in certain aspects of the system construction (website design).
 Major contributions: Towards developing the colored depth/ heat map, Voice control of the system, Website Design and Implementation, Documentation.